1. Project Background & Objective
Client's R&D laboratory and office facility operates highly complex, critical infrastructure supporting sensitive scientific research and corporate operations. To ensure maximum uptime, regulatory compliance, and asset longevity, we require a temporary, highly skilled Maintenance Engineer.
The primary objective of this role is to audit, optimize, and expand our existing Preventative Maintenance (PM) program. This individual will bridge the gap between field maintenance and data systems, converting technical documentation and historical work order data into actionable, detailed maintenance procedures.
2. Scope of Services & Key Responsibilities
The Consultant will work under the direction of the Plant Engineer to execute the following tasks:
Asset & Work Order Audit
Review existing and historical work order data within the Computerized Maintenance Management System (CMMS) to identify procedural gaps.
Cross-reference current asset registries with physical field inventory to ensure critical equipment tags are accurate.
PM Procedure Optimization & Development
Author, revise, and standardize detailed PM job plans and step-by-step procedures for critical utility and facility equipment, including but not limited to:
HVAC Systems: Air Handling Units (AHUs), HEPA filtration loops, and VAV systems.
Exhaust Systems: Lab chemical fume hoods, bio-safety cabinet exhaust fans, and stroboscopic exhaust stacks.
Plant Utilities: Chillers, cooling towers, boilers, and compressed air systems.
High-Purity Utilities: Reverse Osmosis / Deionized Water (RODI) purification and distribution systems.
Integrate safety requirements into all procedures, including Lockout/Tagout (LOTO), Job Hazard Analyses (JHAs), and Personal Protective Equipment (PPE) specifications.
Compliance & Quality Integration
Ensure all written procedures comply with local regulatory bodies, Roche global engineering standards, and applicable Good Manufacturing/Laboratory Practices (GxP).
Incorporate clear "pass/fail" criteria, calibration check-points, and data collection parameters within the PM steps to ensure Good Documentation Practices (GDP) can be maintained by executing technicians.
3. Deliverables Milestone Timeline
The contractor will be responsible for delivering the following finalized packages based on the schedule below:
Milestone / Deliverable
Target Timeline
Description
Gap Analysis Report
Provided within 2 months
A comprehensive assessment report detailing health of the current PM program, identifying high-risk assets lacking adequate PM documentation, and a prioritized timeline for procedure creation.
Standardized PM Templates
Month 3
A standardized, Engineering Manager-approved template format for all written job plans to ensure consistency across mechanical, electrical, and plumbing disciplines.
Finalized PM Job Plans
Ongoing (Batched Monthly)
Batch delivery of finalized, ready-for-upload PM procedures for all targeted equipment classes (AHUs, Chillers, RODI, etc.), complete.
CMMS Change Requests
Project Conclusion
Completed data upload sheets or system change requests required to seamlessly transition the newly authored procedures into the active CMMS database.
Candidate Qualifications & Requirements
Education: B.S. in Mechanical Engineering, Electrical Engineering, Facilities Engineering, or equivalent technical field experience.
Experience: 5 years of experience in facilities engineering, reliability engineering, or maintenance operations within a regulated industry (Biotech, Pharmaceuticals, Healthcare, or Semiconductor).
Technical Knowledge: Deep understanding of commercial/industrial HVAC, chilled water plants, industrial exhaust, and high-purity water system (RODI) operations and failure modes.
Systems Experience: Proficiency with enterprise CMMS platforms (SAP Preferred).
Soft Skills: Exceptional technical writing ability, strong data analytical skills, and the communication skills required to interview field technicians to capture tribal knowledge.
5. Period of Performance & Logistics
Estimated Duration: 6 to 12 months (with potential for extension based on project scope expansion).
Work Location: On-site
Schedule: Standard 40-hour work week, Monday through Friday.
Nesco Resource offers a comprehensive benefits package for our associates, which includes a MEC (Minimum Essential Coverage) plan that encompasses Medical, Vision, Dental, 401K, and EAP (Employee Assistance Program) services.
Nesco Resource provides equal employment opportunities to all employees and applicants for employment and prohibits discrimination and harassment of any type without regard to race, color, religion, age, sex, national origin, disability status, genetics, protected veteran status, sexual orientation, gender identity or expression, or any other characteristic protected by federal, state, or local laws.
Client's R&D laboratory and office facility operates highly complex, critical infrastructure supporting sensitive scientific research and corporate operations. To ensure maximum uptime, regulatory compliance, and asset longevity, we require a temporary, highly skilled Maintenance Engineer.
The primary objective of this role is to audit, optimize, and expand our existing Preventative Maintenance (PM) program. This individual will bridge the gap between field maintenance and data systems, converting technical documentation and historical work order data into actionable, detailed maintenance procedures.
2. Scope of Services & Key Responsibilities
The Consultant will work under the direction of the Plant Engineer to execute the following tasks:
Asset & Work Order Audit
Review existing and historical work order data within the Computerized Maintenance Management System (CMMS) to identify procedural gaps.
Cross-reference current asset registries with physical field inventory to ensure critical equipment tags are accurate.
PM Procedure Optimization & Development
Author, revise, and standardize detailed PM job plans and step-by-step procedures for critical utility and facility equipment, including but not limited to:
HVAC Systems: Air Handling Units (AHUs), HEPA filtration loops, and VAV systems.
Exhaust Systems: Lab chemical fume hoods, bio-safety cabinet exhaust fans, and stroboscopic exhaust stacks.
Plant Utilities: Chillers, cooling towers, boilers, and compressed air systems.
High-Purity Utilities: Reverse Osmosis / Deionized Water (RODI) purification and distribution systems.
Integrate safety requirements into all procedures, including Lockout/Tagout (LOTO), Job Hazard Analyses (JHAs), and Personal Protective Equipment (PPE) specifications.
Compliance & Quality Integration
Ensure all written procedures comply with local regulatory bodies, Roche global engineering standards, and applicable Good Manufacturing/Laboratory Practices (GxP).
Incorporate clear "pass/fail" criteria, calibration check-points, and data collection parameters within the PM steps to ensure Good Documentation Practices (GDP) can be maintained by executing technicians.
3. Deliverables Milestone Timeline
The contractor will be responsible for delivering the following finalized packages based on the schedule below:
Milestone / Deliverable
Target Timeline
Description
Gap Analysis Report
Provided within 2 months
A comprehensive assessment report detailing health of the current PM program, identifying high-risk assets lacking adequate PM documentation, and a prioritized timeline for procedure creation.
Standardized PM Templates
Month 3
A standardized, Engineering Manager-approved template format for all written job plans to ensure consistency across mechanical, electrical, and plumbing disciplines.
Finalized PM Job Plans
Ongoing (Batched Monthly)
Batch delivery of finalized, ready-for-upload PM procedures for all targeted equipment classes (AHUs, Chillers, RODI, etc.), complete.
CMMS Change Requests
Project Conclusion
Completed data upload sheets or system change requests required to seamlessly transition the newly authored procedures into the active CMMS database.
Candidate Qualifications & Requirements
Education: B.S. in Mechanical Engineering, Electrical Engineering, Facilities Engineering, or equivalent technical field experience.
Experience: 5 years of experience in facilities engineering, reliability engineering, or maintenance operations within a regulated industry (Biotech, Pharmaceuticals, Healthcare, or Semiconductor).
Technical Knowledge: Deep understanding of commercial/industrial HVAC, chilled water plants, industrial exhaust, and high-purity water system (RODI) operations and failure modes.
Systems Experience: Proficiency with enterprise CMMS platforms (SAP Preferred).
Soft Skills: Exceptional technical writing ability, strong data analytical skills, and the communication skills required to interview field technicians to capture tribal knowledge.
5. Period of Performance & Logistics
Estimated Duration: 6 to 12 months (with potential for extension based on project scope expansion).
Work Location: On-site
Schedule: Standard 40-hour work week, Monday through Friday.
Nesco Resource offers a comprehensive benefits package for our associates, which includes a MEC (Minimum Essential Coverage) plan that encompasses Medical, Vision, Dental, 401K, and EAP (Employee Assistance Program) services.
Nesco Resource provides equal employment opportunities to all employees and applicants for employment and prohibits discrimination and harassment of any type without regard to race, color, religion, age, sex, national origin, disability status, genetics, protected veteran status, sexual orientation, gender identity or expression, or any other characteristic protected by federal, state, or local laws.
Frequently asked questions
Who is hiring for the Facilities Maintenance Engineer role?
Nesco Resource is hiring for the Facilities Maintenance Engineer position, a Shazamme client. Apply directly on the employer's career site.
Where is the Facilities Maintenance Engineer job located?
The Facilities Maintenance Engineer role with Nesco Resource is based in Pleasanton, CA, US.
What does the Facilities Maintenance Engineer role pay?
Nesco Resource lists the Facilities Maintenance Engineer role at USD 45–51 per hour.
Is the Facilities Maintenance Engineer role full-time or contract?
This is a full time position at Nesco Resource.
What experience level is the Facilities Maintenance Engineer role?
The Facilities Maintenance Engineer position is aimed at mid-level candidates.
How do I apply for the Facilities Maintenance Engineer role at Nesco Resource?
Apply directly on Nesco Resource's career page via the Apply button on this listing. ZammeJobs links straight through to the employer's ATS — no third-party form, no resume database.